Storm Water System Repair Projects
Sector: Water Supply and Storage • Location: Stone Mountain, Georgia, United States of America
Source: Dodge
- 1612 Mountain Shadow Trail a. 180 linear feet of 30 diameter CMP, Upstream Standpipe in Permanent Pool. Scope: i. Dig and Replace 16 lf 30 diameter SRCMP, downstream end ii. Internal Point Repair of next 10 lf upstream from replaced downstream end iii. Outlet Headwall iv. Cured in place pipe lining of the 184 linear foot segment under Mountain Shadow Trail, 30 diameter pipe. v. Bypass pumping.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Stone Mountain, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Storm Water System Repair Projects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. 1612 Mountain Shadow Trail a. 180 linear feet of 30 diameter CMP, Upstream Standpipe in Permanent Pool. Scope: i. Dig and Replace 16 lf 30 diameter SRCMP, downstream end ii. Internal Point Repair of next 10 lf upstream from replaced downstream end iii. Outlet Headwall iv. Cured in place pipe lining of the 184 linear foot segment under Mountain Shadow Trail, 30 diameter pipe. v. Bypass pumping. vi. Clean work area. b. Reference Video and Report c. Reference schedule of values from Bid Form ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Stone Mountain |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
