logo

Stormwater Infrastructure

Sector: Water Supply and Storage • Location: Neosho, Missouri, United States of America

Source: Dodge USA

Project
Closed

The Work to be performed under the Base Bid provisions of this contract consists of the following: Lower High School Branch: Consisting of approximately 1,600 L.F. of storm ditch, cast in place triple 8'x15' box culvert, 235 L.F. of curb and gutter, 712 L.F. of sanitary sewer replacement, 6-60" manholes, 760 S.Y. of pavement replacement, 500 S.Y. of sidewalk, and 500 L.F. of water main relocation.

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Road, Government, Consumer Products, Automotive
Location
Neosho, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Stormwater Infrastructure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Stormwater Infrastructure” is an infrastructure initiative in the Water Supply and Storage sector, located in Neosho, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work to be performed under the Base Bid provisions of this contract consists of the following: Lower High School Branch: Consisting of approximately 1,600 L.F. of storm ditch, cast in place triple 8'x15' box culvert, 235 L.F. of curb and gutter, 712 L.F. of sanitary sewer replacement, 6-60" manholes, 760 S.Y. of pavement replacement, 500 S.Y. of sidewalk, and 500 L.F. of water main relocation. Ancillary items include grading, erosion control and vegetative restoration. Hatchery Branch: Co...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Neosho

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Road, Government, Consumer Products, Automotive

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project