Stormwater Management Pond # PD03-02 Sediment Management
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
This project will remove and dispose of 2,600 m3 of sediment from the pond. The project includes cleaning of outlets and restoration of the disturbed area. The majority of the Town’s storm water ponds had been constructed with permanent storage volume (wet ponds). The purpose of the permanent storage volume in a pond is to allow suspended solids (sediment) from the runoff to settle down in the pon
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will remove and dispose of 2,600 m3 of sediment from the pond. The project includes cleaning of outlets and restoration of the disturbed area. The majority of the Town’s storm water ponds had been constructed with permanent storage volume (wet ponds). The purpose of the permanent storage volume in a pond is to allow suspended solids (sediment) from the runoff to settle down in the pond bottom and release the treated water to the creek. Over time, the pond will accumulate sediment which will reduce the permanent storage, impacting the sediment removal efficiency of the pond drastically, resulting in untreated water being released to the Creek. The Town of Whitby conducted a ponds need study in 2011 to evaluate the pond permanent storage capacity. A bathymetric survey revealed that a fair amount of sediment had accumulated in the ponds and a majority of the ponds require cleanout. Under this project accumulated sediment in the pond will be removed allowing for the required permanent storage in the pond. The resulting pond will perform to its design efficiency which will improve the quality of the runoff released to the creeks. The removal works are capitalized as they extend the life of the asset. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
