logo

Stormwater Management Pond # PD03-02 Sediment Management

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This project will remove and dispose of 2,600 m3 of sediment from the pond. The project includes cleaning of outlets and restoration of the disturbed area. The majority of the Town’s storm water ponds had been constructed with permanent storage volume (wet ponds). The purpose of the permanent storage volume in a pond is to allow suspended solids (sediment) from the runoff to settle down in the pon

Status
Closed
Sector
Water Supply and Storage, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Stormwater Management Pond # PD03-02 Sediment Management

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Stormwater Management Pond PD03-02 Sediment Management” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will remove and dispose of 2,600 m3 of sediment from the pond. The project includes cleaning of outlets and restoration of the disturbed area. The majority of the Town’s storm water ponds had been constructed with permanent storage volume (wet ponds). The purpose of the permanent storage volume in a pond is to allow suspended solids (sediment) from the runoff to settle down in the pond bottom and release the treated water to the creek. Over time, the pond will accumulate sediment which will reduce the permanent storage, impacting the sediment removal efficiency of the pond drastically, resulting in untreated water being released to the Creek. The Town of Whitby conducted a ponds need study in 2011 to evaluate the pond permanent storage capacity. A bathymetric survey revealed that a fair amount of sediment had accumulated in the ponds and a majority of the ponds require cleanout. Under this project accumulated sediment in the pond will be removed allowing for the required permanent storage in the pond. The resulting pond will perform to its design efficiency which will improve the quality of the runoff released to the creeks. The removal works are capitalized as they extend the life of the asset.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project