logo

Stormwater Management Slope Stabilization by Rehabilitating an Existing Retaining Wall along the east side of Clarence Street.

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This project will stabilize the existing slope on the east side of Clarence Street and work will rehabilitate the existing retaining wall to mitigate further stormwater erosion damage to the slope. We will also replace the failed culvert. It will also identify the necessary rehabilitation of stormwater assets to ensure the proper conveyance of stormwater within the vicinity of these creeks. The ex

Project Information FAQ

Project Information

3 Q
The project “Stormwater Management Slope Stabilization by Rehabilitating an Existing Retaining Wall along the east side of Clarence Street.” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will stabilize the existing slope on the east side of Clarence Street and work will rehabilitate the existing retaining wall to mitigate further stormwater erosion damage to the slope. We will also replace the failed culvert. It will also identify the necessary rehabilitation of stormwater assets to ensure the proper conveyance of stormwater within the vicinity of these creeks. The existing slope has failed, south of Wycliffe Avenue. The failure can be attributed to uncontrolled stormwater conveyance due to its proximity to the Humber River and the failure of an existing 2400mm culvert crossing the roadway. Consequently, there are concerns that the existing retaining wall can shift and slide into the creek.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data