logo
ProjectClosed

Stormwater Mgt. and Climate Change Adaptation Project

One of 2,798 projects Taiyo tracks in Senegal.

Source: World Bank

The objective of the Stormwater Management and Climate Change Adaptation Project for Senegal is to improve stormwater drainage and flood prevention in periurban areas of Dakar for the benefit of local residents. There are four components to the project, the first component being flood risk mainstreaming in the urban sector. The component will provide for: (i) consultant services and technical assi

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Forest Products and Packaging, Residential, Government, Education, Commercial
Location
Senegal
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Stormwater Mgt. and Climate Change Adaptation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Stormwater Mgt. and Climate Change Adaptation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Senegal. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Stormwater Management and Climate Change Adaptation Project for Senegal is to improve stormwater drainage and flood prevention in periurban areas of Dakar for the benefit of local residents. There are four components to the project, the first component being flood risk mainstreaming in the urban sector. The component will provide for: (i) consultant services and technical assistance; (ii) goods and small equipment, including GIS-equipment, computers, and office equipment; and (iii) carrying out training and capacity building activities including travel costs related to south-south exchanges. The second component is the drainage investment and management. The component will provide for consultant services (hydraulic, urban planning) and technical assistance in form of an Implementation Support Consultant (ISC) team assisting the Municipal Development Agency (MDA) and municipalities with implementation and detailed feasibility and technical studies. The third component is the community engagement in urban flood-risk reduction and adaptation to climate change. The component will provide for consultant services for the development of the information, education and communication (IEC) strategy and tools as well as technical assistance for carrying out the development, implementation and monitoring of the community investments (social facilitator). Finally, the fourth component is the project coordination, management, monitoring and evaluation.

Original sector

FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Senegal

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Forest Products and Packaging, Residential, Government, Education, Commercial

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project