logo

Straight Creek Drive Sewer Replacement

Sector: Commercial • Location: Dillon, Colorado, United States of America

Source: Dodge USA

Project
Closed

SCP24-02 STRAIGHT CREEK DRIVE ROADWAY RECONSTRUCTION TASK 2 Remove and replace 10950 feet of type 2 curb and gutter. Remove and replace 24 inch culvert. Full Depth Reclamation and pave back 5475 linear feet of road.

Status
Closed
Sector
Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Government
Location
Dillon, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Straight Creek Drive Sewer Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Straight Creek Drive Sewer Replacement” is an infrastructure initiative in the Commercial sector, located in Dillon, Colorado, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SCP24-02 STRAIGHT CREEK DRIVE ROADWAY RECONSTRUCTION TASK 2 Remove and replace 10950 feet of type 2 curb and gutter. Remove and replace 24 inch culvert. Full Depth Reclamation and pave back 5475 linear feet of road.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Dillon

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Government

Article published date

2024-04-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project