The construction site of the bridge. The on-site construction works began in 2011. Footings for the deep foundation fully completed. The steel fabrication work in progress. The Strandherd-Armstrong Bridge links Earl Armstrong Road and Strandherd Drive in Ottawa, Canada. It was built to reduce the congestion and delays on Rideau River crossing, which arose due to the increase in population growth i

Project Information FAQ

Project Information

5 Q
The project “Strandherd-Armstrong Bridge” is an infrastructure initiative in the Airport sector, located in Thailand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The construction site of the bridge. The on-site construction works began in 2011. Footings for the deep foundation fully completed. The steel fabrication work in progress. The Strandherd-Armstrong Bridge links Earl Armstrong Road and Strandherd Drive in Ottawa, Canada. It was built to reduce the congestion and delays on Rideau River crossing, which arose due to the increase in population growth in the South Urban Community (SUC). The bridge also enhances sharing of resources and access to business between Riverside south and Barrhaven of the SUC. The new bridge significantly relieves the traffic pressure on the existing bridges at Manotick and Hunt Club Road. The dedicated transit lanes provide better transit facilities and also reduce the travel time to the Ottawa International Airport. The project is sponsored and operated by the City of Ottawa. The $50m bridge construction started in July 2010 and the completed bridge was opened to traffic in July 2014. The project was conceptualised in 2008. The Rideau Valley Conservation Authority, National Capital Commission, the Algonquin of Ontario and other government agencies approved the construction of the bridge by 2009. The bridge design was also approved by the Federal Government in April 2009. Tenders for construction were closed in February 2010 and the construction was started in July 2010. The project was completed by mid-2014. The project was identified as a critical continuous east-west arterial road by both South Nepean Secondary and the Riverside South Community. The bridge includes four lanes for cars and trucks, two for buses, two for bikes and cycles, two lanes dedicated for turning and two for sidewalks. Landscapes on the east and west riverbanks were restored as part of the project for promoting wildlife habitat, minimising light pollution and managing the storm water in the post-construction period of bridge. In 2007, the Rideau Canal was identified by UNESCO as a world heritage site. The preliminary design of the bridge was prepared in compliance with the policy made to protect the heritage of the designated site in February 2009. The design was approved by the National Capital Commission and Parks Canada. The bridge is 143m-long and 50m-wide. The main arch of the bridge is 31m-high, supported by structured cables. The bridge is in above deck arch structure form. The sidewalks are 3m-wide. Pedestrian-scale lighting is provided along the bridge. The design focused on incorporating heritage features and improving the road conditions for pedestrians and cyclists. It also focused on providing 100-year design life to the structure, high-quality durable materials, minimising the effect on the habitat during the construction and offering cost-effective and safe bridge. The $50m construction contract was originally awarded to ConCreate USL of Bolton, Ontario. The company, however, went into receivership in early-2012. Horseshoe Hill Construction was later awarded the contract for the project. Delcan Corporation is the lead consultant for providing construction services for the project. The groundbreaking ceremony for the bridge construction was held on 27 July 2010. The on-site bridge construction started in April 2011. The total investment for the construction of Strandherd-Armstrong bridge was $50m. The project was financed by the federal and provincial governments of Canada, which had announced their commitments to fund the project in June 2011. They provided funding for the project under Building Canada Fund. The federal government contributed $16m, which is roughly one-third of the project cost. Ottawa’s funding was approved in 2010.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data