STRATEgic GUide to Smart manufacturing
The status, timeline and source of this project. A free account opens every field.
Source: EU Funding & Tenders Portal
Production manufacturing has drastically changed in the last decade, year after year, it became more complex and tightly integrated with new technologies. The application of new technologies can be safely and properly done during the initial design phases of a new production plant. However, one of the key challenges of this so-called “fourth industrial revolution” is that it must be applied to exi
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Advanced Electronics
- Location
- Italy
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about STRATEgic GUide to Smart manufacturing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ongoing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Production manufacturing has drastically changed in the last decade, year after year, it became more complex and tightly integrated with new technologies. The application of new technologies can be safely and properly done during the initial design phases of a new production plant. However, one of the key challenges of this so-called “fourth industrial revolution” is that it must be applied to existing production plants, introducing much more complexity. The goal of STRATEGUS is to provide understandable techniques and software architecture for guiding industrials towards the proper integration of new technologies in their current production plant. STRATEGUS will build the so-called digital twin, a digital representation of the factory plant, that functions as an interface to the sensor data and contains mathematical models of the equipment. The digital twin provides a structured view of sensor data, allowing one to perform timing analysis, make future predictions, and adjust the control strategy. Then, the main orchestrator will be Strategist, a meta-scheduler that has a twofold purpose: 1. estimating the timing behaviour of the events inside the physical plant by harnessing the power of the digital twin, and 2. optimising the activities on the line based on order arrival and reacting to unexpected events and accidents. STRATEGUS takes inspiration for describing the models inside the twin from the theory of multimode systems, where each piece of equipment is modelled as a set of differential or difference equations describing how they manipulate the products’ characteristics until it reaches the state of the finished product. |
Location
Country | Italy |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Advanced Electronics |
Article published date | 2026-02-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Italy
- Torre Santa Susanna Solar Park
- ISAB Energy IGCC Plant
- Fiume Santo Power Station Thermoelectric Power Plant Italy
- Italiana Energia Servizi (IES) Mantua Refinery
- Algeria Sardinia Italy Gas Pipeline (Galsi)
- Milazzo Refinery and Liquid Petroleum Gas (LPG) Storage Plant, Italy
- North Adriatic LNG Terminal
- Cambrex Profarmaco, Paullo
