STRATEGIC INTERCONNECTION AND TRANSMISSION LINES
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The loan will finance the Peruvian side of the Peru-Ecuador power interconnector line consisting in the 500 kV Piura Nueva-Frontera transmission line (270 km) and substation.
The project also includes other strategic transmission lines, such as the 138 kV Puerto Maldonado transmission line (160 km) and the 220 kV Valle del Chira substation.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government
- Location
- Peru
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about STRATEGIC INTERCONNECTION AND TRANSMISSION LINES
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The loan will finance the Peruvian side of the Peru-Ecuador power interconnector line consisting in the 500 kV Piura Nueva-Frontera transmission line (270 km) and substation. The project also includes other strategic transmission lines, such as the 138 kV Puerto Maldonado transmission line (160 km) and the 220 kV Valle del Chira substation. |
Original sector | Energy |
Location
Country | Peru |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
