logo
ProjectNotice Of Completion

Strathcona Cogeneration Facility Connection

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge USA

New substation Ursus 430S Substation) and 2 single circuit 240 kilovolt (kV) transmission lines to connect Inter Pipeline?s CentralUtility Block Substation via a short interconnection to Alberta?s electric system - New substation and transmission lines will be constructed, operated and maintained by AltaLink - Modifications to the 997L line which is the south portion of the adjacent 942L/997L doub

Status
Closed
Sector
Power Generation (CCGT), Power Transmission, Commercial
Location
Strathcona County, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Strathcona Cogeneration Facility Connection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Strathcona Cogeneration Facility Connection” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Strathcona County, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Notice of Completion

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

New substation Ursus 430S Substation) and 2 single circuit 240 kilovolt (kV) transmission lines to connect Inter Pipeline?s CentralUtility Block Substation via a short interconnection to Alberta?s electric system - New substation and transmission lines will be constructed, operated and maintained by AltaLink - Modifications to the 997L line which is the south portion of the adjacent 942L/997L double circuit transmission line - 4 240 kV circuit breakers and associated equipment and control bui...

Budget

Location

Country

Canada

State

Alberta

City

Strathcona County

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project