logo

Strathcona Discharge Upgrade

Sector: Hydro • Location: Campbell River, British Columbia, Canada

Source: Dodge USA

Project
Bidding

The purpose of this Request for Proposal (RFP) is to invite the interested parties to submit proposals for the construction of a new low level outlet and upgrade of the existing spillway gates system by strengthening of the pier and upstream retaining wall and replacement of the gates with a free concrete overflow spillway. The contract includes mechanical, civil, structural, geotechnical, electri

Status
Prospective
Sector
Hydro, Cement, Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment
Location
Campbell River, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Strathcona Discharge Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Strathcona Discharge Upgrade” is an infrastructure initiative in the Hydro sector, located in Campbell River, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of this Request for Proposal (RFP) is to invite the interested parties to submit proposals for the construction of a new low level outlet and upgrade of the existing spillway gates system by strengthening of the pier and upstream retaining wall and replacement of the gates with a free concrete overflow spillway. The contract includes mechanical, civil, structural, geotechnical, electrical, protection and control work at Strathcona dam, that is located approximately 30 km west of t...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Campbell River

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydro, Cement, Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2024-07-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project