logo
ProjectPlanned

Stratos Data Center Campus

The owner, status and timeline of this project. A free account opens every field.

Source: The Times-Independent

The Stratos project is a massive hyperscale data center campus backed by Utah's Military Installation Development Authority and celebrity investor Kevin O'Leary. It will occupy about 40,000 acres in Hansel Valley, Utah, and at full buildout, it will use more than twice the power of the entire state of Utah. The project will generate its own power using natural gas and operate on a closed-loop wate

Status
Prospective
Sector
Natural Gas, Water Supply and Storage, Power Generation (CCGT), Data Center
Location
Tremonton, Utah, United States of America
Updated
22 Jul 2026
Source
The Times-Independent

ConstructChat

Ask ConstructChat about Stratos Data Center Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Stratos Data Center Campus” is an infrastructure initiative in the Natural Gas sector, located in Tremonton, Utah, United States. Taiyo aggregates data on it from The Times-Independent.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Stratos project is a massive hyperscale data center campus backed by Utah's Military Installation Development Authority and celebrity investor Kevin O'Leary. It will occupy about 40,000 acres in Hansel Valley, Utah, and at full buildout, it will use more than twice the power of the entire state of Utah. The project will generate its own power using natural gas and operate on a closed-loop water system to reuse water. The first phase is expected to begin within a few months and requires 3 gigawatts of power, with full buildout expected to use 9 gigawatts.

Original sector

Built Sector

Budget

Location

Country

United States of America (USA)

State

Utah

City

Tremonton

Source

Source

The Times-Independent

URL

More Details

Record type

Project

Sector

Natural Gas, Water Supply and Storage, Power Generation (CCGT), Data Center

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project