logo

Stratos Hyperscale Data Center

Sector: Natural Gas • Location: Tremonton, Utah, United States

Source: The Cool Down

Project
Approved

A massive hyperscale data center development in Hansel Valley, Utah, approved despite local protests. The project spans 40,000 acres, approximately 2.5 times the size of Manhattan, and is backed by Utah's Military Installation Development Authority and billionaire investor Kevin O'Leary. The development aims to support national security, create jobs, and bolster the US in the AI race, with a proje

Status
Prospective
Sector
Natural Gas, Water Supply and Storage, Power Generation (CCGT), Data Center
Location
Tremonton, Utah, United States of America
Updated
22 Jul 2026
Source
The Cool Down

ConstructChat

Ask ConstructChat about Stratos Hyperscale Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Stratos Hyperscale Data Center” is an infrastructure initiative in the Natural Gas sector, located in Tremonton, Utah, United States. Taiyo aggregates data on it from The Cool Down.

Participants

Not available for this record.

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A massive hyperscale data center development in Hansel Valley, Utah, approved despite local protests. The project spans 40,000 acres, approximately 2.5 times the size of Manhattan, and is backed by Utah's Military Installation Development Authority and billionaire investor Kevin O'Leary. The development aims to support national security, create jobs, and bolster the US in the AI race, with a projected power demand of up to 9 gigawatts at full buildout, using natural gas for electricity generation and a water-recycling closed-loop system.

Original sector

Technology

Location

Country

United States of America (USA)

State

Utah

City

Tremonton

Source

Source

The Cool Down

URL

More Details

Record type

Project

Sector

Natural Gas, Water Supply and Storage, Power Generation (CCGT), Data Center

Article published date

2026-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project