Stratos Project Data Center
Planned · Utah · Last reported Apr 2026
Source: ABC4 Utah
The Stratos Project is a large-scale data center planned to be built in a rural area in Box Elder County, Utah. The project is being developed through a partnership between O’Leary Digital and West GenCo, with development occurring in phases over multiple years. The project requires acquisition of water rights and submission of master and site plans to the Design Committee. A second water rights a
- Status
- Prospective
- Sector
- Natural Gas, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Data Center
- Location
- Box Elder, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- ABC4 Utah
ConstructChat
Ask ConstructChat about Stratos Project Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Stratos Project is a large-scale data center planned to be built in a rural area in Box Elder County, Utah. The project is being developed through a partnership between O’Leary Digital and West GenCo, with development occurring in phases over multiple years. The project requires acquisition of water rights and submission of master and site plans to the Design Committee. A second water rights application was filed by Murray Hollow L.C. for industrial use including power generation at a natural gas fired power plant and for the data center. The project has faced formal protests regarding water use and environmental impacts. |
Original sector | Built Sector |
Location
Country | United States of America (USA) |
State | Utah |
City | Box Elder |
Source
Source | ABC4 Utah |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Data Center |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
