logo
ProjectPlanned

Stratos Project Utah Data Center

One of 10,000+ projects Taiyo tracks in Utah.

Source: AOL

The Stratos Project is a massive data center development in Box Elder County, Utah, led by O'Leary Digital, owned by Kevin O'Leary. It spans roughly 40,000 acres and includes hyperscale data centers, energy generation, and related infrastructure. At full build-out, it will have a power capacity of 9 gigawatts, more than twice the entire state's current usage. The project promises thousands of jobs

Status
Prospective
Sector
Power Generation (CCGT), Water Supply and Storage, Data Center
Location
Box Elder County, Utah, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about Stratos Project Utah Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Stratos Project Utah Data Center” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Box Elder County, Utah, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Stratos Project is a massive data center development in Box Elder County, Utah, led by O'Leary Digital, owned by Kevin O'Leary. It spans roughly 40,000 acres and includes hyperscale data centers, energy generation, and related infrastructure. At full build-out, it will have a power capacity of 9 gigawatts, more than twice the entire state's current usage. The project promises thousands of jobs and new tax revenue but faces local opposition due to concerns about power use, water strain, and transparency.

Original sector

Technology

Location

Country

United States of America (USA)

State

Utah

City

Box Elder County

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Data Center

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project