logo

Stream U.S. Data Centers Large-Scale Data Center at STAMP

Sector: Water Supply and Storage • Location: Alabama, New York, United States

Source: Native News Online

Project
Proposed

Proposed construction of a large-scale data center at the Western New York Science and Technology Advanced Manufacturing Park (STAMP) in Alabama, NY. The data center would span approximately 900,000 square feet, require 250 megawatts of electricity annually, burn 60,000 gallons of diesel fuel per year, and consume 10,000 gallons of water each day. The project is heavily subsidized by taxpayers wit

Status
Prospective
Sector
Water Supply and Storage, Data Center, Manufacturing (Industrial), Power Generation (CCGT)
Location
Alabama, New York, United States of America
Updated
22 Jul 2026
Source
Native News Online

ConstructChat

Ask ConstructChat about Stream U.S. Data Centers Large-Scale Data Center at STAMP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Stream U.S. Data Centers Large-Scale Data Center at STAMP” is an infrastructure initiative in the Water Supply and Storage sector, located in Alabama, New York, United States. Taiyo aggregates data on it from Native News Online.

Participants

Not available for this record.

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposed construction of a large-scale data center at the Western New York Science and Technology Advanced Manufacturing Park (STAMP) in Alabama, NY. The data center would span approximately 900,000 square feet, require 250 megawatts of electricity annually, burn 60,000 gallons of diesel fuel per year, and consume 10,000 gallons of water each day. The project is heavily subsidized by taxpayers with public support totaling $472 million.

Original sector

Built Sector

Budget

Location

Country

United States of America (USA)

State

New York

City

Alabama

Source

Source

Native News Online

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Data Center, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project