logo

Street and Highway 395 Intersection Improvements REBID

Sector: Water Supply and Storage • Location: Hermiston, Oregon, United States of America

Source: Dodge USA

Project
Closed

The Work for this Project includes, but is not limited to, the reconstruction of an existing intersection, including placement of approximately 600 square yards of asphalt concrete pavement section and adjacent curb, gutter, sidewalk, and driveway approaches; storm drainage; signing and striping; and installing landscaping and gateway monument features.

Status
Closed
Sector
Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Mass Transit, Automotive, Rail, Government, Commercial
Location
Hermiston, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Street and Highway 395 Intersection Improvements REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Street and Highway 395 Intersection Improvements REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Hermiston, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work for this Project includes, but is not limited to, the reconstruction of an existing intersection, including placement of approximately 600 square yards of asphalt concrete pavement section and adjacent curb, gutter, sidewalk, and driveway approaches; storm drainage; signing and striping; and installing landscaping and gateway monument features.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Hermiston

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Mass Transit, Automotive, Rail, Government, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project