Street Patching Improvements
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge USA
The Project consists of 3 Surface Removal and Replacement with 3 of HMA Surface Course, IL 9.5, N50, Manhole Adjustments, and Water Valve Adjustment. Additional Description: Work shall take place on Fox Knoll Drive, North Birch Drive, Lions Drive, Rollin Drive, Provost Street, Church Street, Townline Road, and Shumway Street.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
- Location
- Lena, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Street Patching Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of 3 Surface Removal and Replacement with 3 of HMA Surface Course, IL 9.5, N50, Manhole Adjustments, and Water Valve Adjustment. Additional Description: Work shall take place on Fox Knoll Drive, North Birch Drive, Lions Drive, Rollin Drive, Provost Street, Church Street, Townline Road, and Shumway Street. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Lena |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
