Street Pavement Rehabilitation Program
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
This project consists of all work associated with the unit price bid for rehabilitation of Cherry Street between S. East Street and S. Grand Avenue, including demolition of the existing street; preparation of 6 minimum stabilized subgrade; curb-and-gutter replacement; and driveway and sidewalk demolition and reconstruction (up to 5 behind back of curb). Asphalt placement, construction of sidewalks
- Status
- Closed
- Sector
- Car parking, Commercial, Road, Government, Automotive
- Location
- Sherman, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Street Pavement Rehabilitation Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of all work associated with the unit price bid for rehabilitation of Cherry Street between S. East Street and S. Grand Avenue, including demolition of the existing street; preparation of 6 minimum stabilized subgrade; curb-and-gutter replacement; and driveway and sidewalk demolition and reconstruction (up to 5 behind back of curb). Asphalt placement, construction of sidewalks parallel to Cherry St., and barrier-free ramp construction are not included in this scope. Proje... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Sherman |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Road, Government, Automotive |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
