Street Reconstruction Phase 14A
Sector: Water Supply and Storage • Location: The Colony, Texas, United States of America
Source: Dodge USA
The scope of work consists of the reconstruction of King Street from Ramsey Drive to Gibson Drive, Norris Drive from Miller Drive to Paige Road, and Knox Drive from Miller Drive to Paige Road. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, approximately 11,200 SY of 6-inch thick reinforced concrete pavement on flex base subgrade, and approxima
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Cement, Car parking, Government, Waste Processing and Treatment, Automotive, Commercial
- Location
- The Colony, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Street Reconstruction Phase 14A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Design Development |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work consists of the reconstruction of King Street from Ramsey Drive to Gibson Drive, Norris Drive from Miller Drive to Paige Road, and Knox Drive from Miller Drive to Paige Road. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, approximately 11,200 SY of 6-inch thick reinforced concrete pavement on flex base subgrade, and approximately 28,200 SF of 4-inch thick reinforced concrete sidewalks, approximately 3,500 LF of 8- inch d... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | The Colony |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Cement, Car parking, Government, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
