Streetlight Wire Theft Replacement Phase 1
Sector: Steel • Location: Las Vegas, Nevada, United States of America
Source: Dodge USA
The scope includes the replacement of; streetlight wire, pull box covers, damaged streetlight conduit, and missing handhole covers. Work will consist of installing aluminum wire where needed as identified on the plans. Installation of pull box covers, streetlight conduit, and/or handhole covers shall be completed when deemed necessary
- Status
- Prospective
- Sector
- Steel, Metal, Road, Government, Commercial
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Streetlight Wire Theft Replacement Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope includes the replacement of; streetlight wire, pull box covers, damaged streetlight conduit, and missing handhole covers. Work will consist of installing aluminum wire where needed as identified on the plans. Installation of pull box covers, streetlight conduit, and/or handhole covers shall be completed when deemed necessary |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Road, Government, Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
