STREETSCAPE & PEDESTRIAN IMPROVEMENTS IN ELLAVILLE
Complete · Georgia
Source: Georgia Department of Transportation (GDOT)
This 0.32 mile project will construct streetscaping, in accordance with the American with Disabilities Act, including decorative brick sidewalks, ADA ramps, crosswalks, and pedestrian lighting, within the downtown business district as part of Ellaville's plan to enhance the pedestrian transportation system. All work will be done within the existing right of way. The pedestrian lights poles will i
- Status
- Closed
- Sector
- Car parking, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about STREETSCAPE & PEDESTRIAN IMPROVEMENTS IN ELLAVILLE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This 0.32 mile project will construct streetscaping, in accordance with the American with Disabilities Act, including decorative brick sidewalks, ADA ramps, crosswalks, and pedestrian lighting, within the downtown business district as part of Ellaville's plan to enhance the pedestrian transportation system. All work will be done within the existing right of way. The pedestrian lights poles will incorporate a break-away design. The existing speed limit within the project limits is 35 MPH. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive |
Article published date | 2024-03-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
