logo
ProjectPreparation

Strengthening Electrical Integration and Moving Forward with the Ecuador–Peru Interconnection

Sector: Power Generation (CCGT) • Location: Ecuador

Source: Inter-American Development Bank (IADB)

Support Ecuador in strengthening the technical and institutional capacities required for the effective implementation of the operation RG-L1140 "Ecuador - Perú Power Interconnection System in 500 kV, Ecuadorian line", promoting the safe, resilient, and efficient operation of the power system while contributing to regional energy integration. The specific objectives of this Technical Cooperation ar

Status
Prospective
Sector
Power Generation (CCGT)
Location
Ecuador
Updated
19 Nov 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about Strengthening Electrical Integration and Moving Forward with the Ecuador–Peru Interconnection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Strengthening Electrical Integration and Moving Forward with the Ecuador–Peru Interconnection” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ecuador. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Not available for this record.

Status

Original status

preparation

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Support Ecuador in strengthening the technical and institutional capacities required for the effective implementation of the operation RG-L1140 "Ecuador - Perú Power Interconnection System in 500 kV, Ecuadorian line", promoting the safe, resilient, and efficient operation of the power system while contributing to regional energy integration. The specific objectives of this Technical Cooperation are: (i) strengthening the operational security, stability, and resilience of the regional electrical interconnection among Ecuador, Colombia, and Peru by enhancing the power system's control, coordination, and response capabilities under scenarios of high renewable energy penetration and operational contingencies; and (ii) strengthening the technical and institutional capacities of Ecuadorian power sector entities for the planning, regulation, and operation of interconnected power systems, in line with international standards and the requirements of regional energy integration.

Original sector

ENERGY

Budget

Location

Country

Ecuador

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-07-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project