STRENGTHENING OF THE PRIORITY TOURISM DESTINATION AREQUIPA-COLCA IN PERU
Sector: Road • Location: Peru
Source: World Bank Group
This project is a pilot to unlock tourism development at the regional level through multi-sector interventions. The project is designed to address the multifaceted challenges and opportunities for tourism in Arequipa through coordinated multisectoral investments aiming at identified gaps in connectivity, public services and tourism amenities and sites. The project recognizes that effective tourism
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Hotel, Government
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about STRENGTHENING OF THE PRIORITY TOURISM DESTINATION AREQUIPA-COLCA IN PERU
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pipeline |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is a pilot to unlock tourism development at the regional level through multi-sector interventions. The project is designed to address the multifaceted challenges and opportunities for tourism in Arequipa through coordinated multisectoral investments aiming at identified gaps in connectivity, public services and tourism amenities and sites. The project recognizes that effective tourism development requires a holistic approach that integrates infrastructure improvements, cultural heritage preservation, and effective destination management and promotion. The project focuses on developing tourism routes between the city of Arequipa and the Colca Valley (in the Arequipa region) through the following four complementary components:Component 1. Improving the quality of selected tourist attractions : 1.1) Develop and improve services in targeted sites and attractions and 1.2) Rehabilitate cultural sites Component 2. Upgrading roads and investing in water, sanitation and health facilities focusing on : 2.1) Upgrading the quality of key roads along the identified tourism routes, and 2.2) Improving the water and sewage systems in towns on the identified tourist routes 2.3) construction of a health center and forest rehabilitation.Component 3. Institutional strengthening. Component 4. Project implementation. |
Original sector | Industry, Trade and Services,Public Administration,Social Sustainability and Inclusion,Transportation,Water, Sanitation and Waste Management |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Hotel, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Peru
- Longitudinal de La Sierra - Tramo 2
- Costa Sierra Section 1B
- Via Expressa Sur
- Autopista del Sol II
- Costa Sierra: Ovalo-Chancay-Huaral-Acos Stretch
- Vias Nuevas de Lima Toll Road Concession
- Consorcio Transmantaro S.A.
- Villa María Hospital; Callao Hospital; Trecca Tower Medical Center; and Distribution Centers
