logo

Strengthening Preparedness and Critical Emergency Infrastructure Project

Sector: Forest Products and Packaging • Location: Romania

Source: World Bank Group

Project
Active

The development objective of the Strengthening Preparedness and Critical Emergency Infrastructure Project for Romania is to enhance the resilience of Romanian Gendarmerie Facilities that are critical to respond to Emergency Situations and disasters and to strengthen the institutional capacities for emergency preparedness and response. It has three components. First component, Enhance the Resilienc

Status
Prospective
Sector
Forest Products and Packaging, Commercial, Government
Location
Romania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Strengthening Preparedness and Critical Emergency Infrastructure Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Strengthening Preparedness and Critical Emergency Infrastructure Project” is an infrastructure initiative in the Forest Products and Packaging sector, located in Romania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Strengthening Preparedness and Critical Emergency Infrastructure Project for Romania is to enhance the resilience of Romanian Gendarmerie Facilities that are critical to respond to Emergency Situations and disasters and to strengthen the institutional capacities for emergency preparedness and response. It has three components. First component, Enhance the Resilience of Selected Romanian Gendarmerie Infrastructure to be Used in Disaster Response will support priority retrofitting and reconstruction investments and technical assistance to enhance the emergency situations response capacity of selected Romanian Gendarmerie facilities and guide future infrastructure planning that covers the entire building stock managed by the General Inspectorate of the Romanian Gendarmerie (GIRG).It has two sub-components. (i) Priority Investments, and (ii) Long-Term Infrastructure Investment Planning; Second component, Operational Readiness and Public Awareness will strengthen the institutional capacity of the Romanian Gendarmerie to ensure operational readiness in the event of an emergency through a series of trainings and acquisition of essential emergency equipment. It has two sub-components.(i) Operational Readiness for Emergency Response, and (ii) Public Awareness; Third component, Project Management will strengthen the institutional capacity of the Romanian Gendarmerie in project management. This component will support operating costs to ensure timely and efficient implementation of the project. It will also cover costs related to activities designed to build the Romanian Gendarmerie’s technical, procurement, financial management (FM), monitoring and evaluation (M&E), and environmental and social safeguards capacities. This component will also support the establishment and operation of a grievance redress mechanism (GRM) to address and mitigate adverse impacts on citizens that may arise during implementation.

Original sector

FY17 - Public Administration

Budget

Location

Country

Romania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project