logo

Strengthening the electricity distribution network in Zambia

Sector: Power Generation (CCGT) • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Ongoing

The project is located in four provinces that fall within ZESCO’s southern region. The region, which represents half of the country's surface area and half of its population, was neglected by the electrification policy until now: access rate to electricity is only 10% on average, with a range oscillating between 4% and 17% depending on the provinces.In this context, the project aims at improving t

Project Information FAQ

Project Information

4 Q
The project “Strengthening the electricity distribution network in Zambia” is an infrastructure initiative in the Power Generation (CCGT) sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is located in four provinces that fall within ZESCO’s southern region. The region, which represents half of the country's surface area and half of its population, was neglected by the electrification policy until now: access rate to electricity is only 10% on average, with a range oscillating between 4% and 17% depending on the provinces.In this context, the project aims at improving the performance of the energy grid and network, and at increasing access to electricity for populations, small business and public institutions (health centres, schools, etc.).One of the project components will be dedicated to extending the supply and transmission grid which covers the last 30 metres separating the grid from the final consumer, as well as the electric meter (all rolled out meters will be prepaid). 

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data