Strominvest II
Sector: Car parking • Location: Belarus
Source: International Finance Corporation (IFC)
IFC is considering an investment, in the form of a corporate loan of up to US $17 million in EUR equivalent, to Strominvest Group (the “group”, the “company” or “Strominvest”), the leading construction and development company in the Republic of Belarus. The company is undertaking a project for a construction of an affordable housing complex, located in west of Minsk with the total size of 20,000 s
- Status
- Closed
- Sector
- Car parking, Residential, Commercial, Hotel, Government, Automotive
- Location
- Belarus
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Strominvest II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | IFC is considering an investment, in the form of a corporate loan of up to US $17 million in EUR equivalent, to Strominvest Group (the “group”, the “company” or “Strominvest”), the leading construction and development company in the Republic of Belarus. The company is undertaking a project for a construction of an affordable housing complex, located in west of Minsk with the total size of 20,000 sq.m. and with the total project cost of US$25 million. The group’s main assets are: 10.5k sq.m. A-class business centre (Erilin), which is an existing IFC investment committed in 2008, 125 room 3 stars BonHotel (Srominvest-Estate), 3.810 sq.m. B-class business centre (Strominvest), and mixture of trade and retail centers with the total space of 2,200 sq.m. (Strominvest). Affordable housing by Strominvest is represented by high-rise apartment blocks, with average flats’ size of 58 m2, built across Minsk. Residential complexes are connected to public utilities; equipped with necessary infrastructure for comfort and safe living (like elevators, fire protection systems, ventilation); and typically include a playground for children and open parking. Kamennaya Gorka 3 (the project) will comprise two 19-storey buildings and one 10-storey building. Construction will commence in 2015 and will take 24 months to complete. |
Original sector | D-AA - Construction and Real Estate |
Location
Country | Belarus |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Car parking, Residential, Commercial, Hotel, Government, Automotive |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in Belarus
- Belorusneft Rechytsa Solar PV Park
- CMG Logistics Park - Phase I, Great Stone Industrial Park, Smolevichy, Minsk
- Providing availability to the touristically and economically valuable areas – improvement of road quality in the Polish-Belarusian borderland
- Cross-border Craft Heritage Network
- Improving cross-border environmental protection system of Czeremcha and Vysokaje through the development of sewerage infrastructure
- Velcom Bragin Solar PV Park
- China-Belarus Great Stone Industrial Park
- The Actualization and Restoration of the European Cultural Landscape on the Lithuanian/Belarusian border
