Structural 83 PLACE
The status, timeline and source of this project. A free account opens every field.
Source: City of New York
application filed for the removal of the exterior concrete deck and associated structure. Removal of first floor door. replace with new window in modified opening. infill wall as needed.
- Status
- Prospective
- Sector
- Bridge, Cement
- Location
- New York City, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- City of New York
ConstructChat
Ask ConstructChat about Structural 83 PLACE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | application filed for the removal of the exterior concrete deck and associated structure. Removal of first floor door. replace with new window in modified opening. infill wall as needed. |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | City of New York |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement |
Article published date | 2026-08-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in USA
- East Central Street Bridge Funding
- Pine Grove Bridge Replacement
- North Oceanside (Eastbrook to Shell)
- Western Bay Bridge Approach Trolley Overhead Reroute Project
- I-295 Veranda Street Bridge
- Pelham Bay Bridge Replacement
- Galvanic Concrete Encasements for Accelerated Repair and Service Life Extension
- San Onofre to Pulgas Double Track
