Structural and Drainage Repair at RTI
One of 10,000+ projects Taiyo tracks in Colorado.
Source: Dodge USA
Remove debris and dead vegetation from specified area. Demo concrete sidewalk in areas directly below the downspouts (3x). Install dry creek bed from the edge of sidewalk at the RTI to the top of the hill at the CTS barracks. Location of the dry creek bed should be installed from the edge of the electrical room to the corner of the CTS barracks building. Continue the design intent of the existing
- Status
- Closed
- Sector
- Consumer Products, Water Supply and Storage, Cement, Waste Processing and Treatment, Commercial, Car parking, Power Generation (CCGT), Automotive, Raw Materials
- Location
- Colorado Springs, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Structural and Drainage Repair at RTI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove debris and dead vegetation from specified area. Demo concrete sidewalk in areas directly below the downspouts (3x). Install dry creek bed from the edge of sidewalk at the RTI to the top of the hill at the CTS barracks. Location of the dry creek bed should be installed from the edge of the electrical room to the corner of the CTS barracks building. Continue the design intent of the existing dry creek bed and drainage system on the northeast side of the CTS building. Install new concrete... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Colorado Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Water Supply and Storage, Cement, Waste Processing and Treatment, Commercial, Car parking, Power Generation (CCGT), Automotive, Raw Materials |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
