Structural and Drainage Repair at RTI
Sector: Commercial • Location: Colorado Springs, Colorado, United States of America
Source: Dodge USA
Remove debris and dead vegetation from specified area. Demo concrete sidewalk in areas directly below the downspouts (3x). Install dry creek bed from the edge of sidewalk at the RTI to the top of the hill at the CTS barracks. Location of the dry creek bed should be installed from the edge of the electrical room to the corner of the CTS barracks building. Continue the design intent of the existing
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Consumer Products, Power Generation (CCGT), Waste Processing and Treatment, Car parking, Automotive, Raw Materials
- Location
- Colorado Springs, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Structural and Drainage Repair at RTI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove debris and dead vegetation from specified area. Demo concrete sidewalk in areas directly below the downspouts (3x). Install dry creek bed from the edge of sidewalk at the RTI to the top of the hill at the CTS barracks. Location of the dry creek bed should be installed from the edge of the electrical room to the corner of the CTS barracks building. Continue the design intent of the existing dry creek bed and drainage system on the northeast side of the CTS building. Install new concrete... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Colorado Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Consumer Products, Power Generation (CCGT), Waste Processing and Treatment, Car parking, Automotive, Raw Materials |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
