Structural BROADWAY
Active · New York
Source: City of New York
IN-KIND REPLACEMENT OF DAMAGED EXTERIOR CMU RETAINING WALL. REMOVAL OF DETERIORATED MASONRY AND INSTALLATION OF NEW WALL AND FOOTING AT SAME LOCATION, DEPTH, AND HEIGHT TO MATCH EXISTING. NO CHANGE TO SITE GRADE, DRAINAGE, OR FOOTPRINT.
- Status
- Prospective
- Sector
- Cement, Road
- Location
- New York City, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- City of New York
ConstructChat
Ask ConstructChat about Structural BROADWAY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | IN-KIND REPLACEMENT OF DAMAGED EXTERIOR CMU RETAINING WALL. REMOVAL OF DETERIORATED MASONRY AND INSTALLATION OF NEW WALL AND FOOTING AT SAME LOCATION, DEPTH, AND HEIGHT TO MATCH EXISTING. NO CHANGE TO SITE GRADE, DRAINAGE, OR FOOTPRINT. |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | City of New York |
URL |
More Details
Record type | Project |
Sector | Cement, Road |
Article published date | 2026-08-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in USA
- Galvanic Concrete Encasements for Accelerated Repair and Service Life Extension
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- Prestress Losses in UHPC and Hybrid Precast, Prestressed Bridge Girders
- Prep-work to begin on Memorial Bridge project
- Truck Parking at Canoe Creek Service Plaza
- Orchard Drive East Road Improvement Project
- Celina Parkway Repair and Resurfacing
- Barnard Barn Artist Studio Conversion
