Structural CLAY AVENUE
The status, timeline and source of this project. A free account opens every field.
Source: City of New York
PROVIDE TEMPORARY SHORING AT THE FIFTH AND SIXTH FLOOR LEVELS TO SUPPORT EXISTING WOOD JOISTS FRAMING AT THE EXISTING FIRE DAMAGED ROOF ASSEMBLY TO ENSURE STRUCTURAL STABILITY.
- Status
- Prospective
- Location
- New York City, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- City of New York
ConstructChat
Ask ConstructChat about Structural CLAY AVENUE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | PROVIDE TEMPORARY SHORING AT THE FIFTH AND SIXTH FLOOR LEVELS TO SUPPORT EXISTING WOOD JOISTS FRAMING AT THE EXISTING FIRE DAMAGED ROOF ASSEMBLY TO ENSURE STRUCTURAL STABILITY. |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | City of New York |
URL |
More Details
Record type | Project |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
