Structural CONOVER STREET
The status, timeline and source of this project. A free account opens every field.
Source: City of New York
Project includes installing 2 sawtooth boxes on the pier to power moored vessels, with under-pier and interior conduits, 2 ground switches, wall framing and electrical work for a new room, bollards, and demolition as needed for component installation.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Road
- Location
- New York City, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- City of New York
ConstructChat
Ask ConstructChat about Structural CONOVER STREET
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Project includes installing 2 sawtooth boxes on the pier to power moored vessels, with under-pier and interior conduits, 2 ground switches, wall framing and electrical work for a new room, bollards, and demolition as needed for component installation. |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | City of New York |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road |
Article published date | 2026-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
