Structural FREDERICK DOUGLASS BOULEVARD
The status, timeline and source of this project. A free account opens every field.
Source: City of New York
THE SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO THE CONSTRUCTION OF NEW STEEL CANOPY, CONCRETE PAD AND STEEL ENCLOSURE, AND STEEL RAISEDFLOOR, STAIRS AND RAMP
- Status
- Prospective
- Sector
- Consumer Products, Road, Cement, Steel, Government
- Location
- New York City, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- City of New York
ConstructChat
Ask ConstructChat about Structural FREDERICK DOUGLASS BOULEVARD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | THE SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO THE CONSTRUCTION OF NEW STEEL CANOPY, CONCRETE PAD AND STEEL ENCLOSURE, AND STEEL RAISEDFLOOR, STAIRS AND RAMP |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | City of New York |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Road, Cement, Steel, Government |
Article published date | 2026-02-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in USA
- Daniel Webster Western Beltway Resurfacing Improvements
- Turnpike Resurfacing Improvements MP 260 to MP 265
- Logan to Wellsville
- Connected Vehicle Deployment Project Floridas TurnpikeSR 91 Beachline EXPYSR 528
- Queue Warning Installation Project Systemwide
- Sand Lake Interchange
- Poinciana Parkway Extension Connector PDE
- Turnpike Resurfacing and Improvements MP 1985MP 207 and MP 2485MP 251
