Structural JUNCTION BOULEVARD
Active · New York
Source: City of New York
REMOVAL OF CONNECTING BRIDGE (VEHICULAR LANE AND PEDESTRIAN WALKWAY) BETWEEN TWO BUILDINGS ABOVE 62ND DRIVE. OPENINGS TO EXTERIOR WALL TO BE INFILLED WITH NEW PRECAST CONCRETE AND METAL RAILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
- Status
- Prospective
- Sector
- Bridge, Cement, Road, Metal
- Location
- New York City, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- City of New York
ConstructChat
Ask ConstructChat about Structural JUNCTION BOULEVARD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | REMOVAL OF CONNECTING BRIDGE (VEHICULAR LANE AND PEDESTRIAN WALKWAY) BETWEEN TWO BUILDINGS ABOVE 62ND DRIVE. OPENINGS TO EXTERIOR WALL TO BE INFILLED WITH NEW PRECAST CONCRETE AND METAL RAILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
Location
Country | United States of America (USA) |
State | New York |
City | New York City |
Source
Source | City of New York |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Road, Metal |
Article published date | 2026-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
