Structural upgrade to wastewater forcemain at Holditch Street extension
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
The project is to replacement a section of 200mm High-density Polyethylene (HDPE) sanitary force main pipe with 200mm water main quality pipe. High-density polyethylene force main pipes installed in the early 1970’s has failed in several locations in town. This section for replacement is a sensitive location that crosses under the Trans-Canada Highway and a railway line. This work is a continuatio
- Status
- Closed
- Sector
- Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Mass Transit, Rail, Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Structural upgrade to wastewater forcemain at Holditch Street extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is to replacement a section of 200mm High-density Polyethylene (HDPE) sanitary force main pipe with 200mm water main quality pipe. High-density polyethylene force main pipes installed in the early 1970’s has failed in several locations in town. This section for replacement is a sensitive location that crosses under the Trans-Canada Highway and a railway line. This work is a continuation of force main replacement that was made this year as part of the 2016 Holditch Storm Sewer Separation project. Further, a short section storm separation located at the north end of the 2016 project on Holditch Street will be included. Note, all work is adjacent to the 2016 Storm Separation Project, not part of the project. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial), Mass Transit, Rail, Road |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
