Structural Watermain Relining on Tamarac Trail from Henderson Dr. to Ardill Cr.
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
This project includes the watermain relining on Tamarac Trail (from Henderson Dr. to Ardill Cr.), Milgate Place and Albery Cr. In addition to the watermain being relined, all water valves and hydrants will be replaced. Work will include 525m of 150mm diameter watermain relined, 650m of 200mm diameter watermain relined, 12 valves replaced and 9 fire hydrants replaced.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Structural Watermain Relining on Tamarac Trail from Henderson Dr. to Ardill Cr.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the watermain relining on Tamarac Trail (from Henderson Dr. to Ardill Cr.), Milgate Place and Albery Cr. In addition to the watermain being relined, all water valves and hydrants will be replaced. Work will include 525m of 150mm diameter watermain relined, 650m of 200mm diameter watermain relined, 12 valves replaced and 9 fire hydrants replaced. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
