Structure replacement - Bridge A154 REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construction of BIA ROUTE 88 STRUCTURE REPLACEMENT BRIDGE A154 includes removal of existing structure, obliterating portions of existing road, new bridge, drainage and culverts, grading, heavy roadway shaping, gravel surfacing, fencing, erosion control, seeding, fertilizing, and fiber mulching.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Fertilizers, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Rapid City, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Structure replacement - Bridge A154 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of BIA ROUTE 88 STRUCTURE REPLACEMENT BRIDGE A154 includes removal of existing structure, obliterating portions of existing road, new bridge, drainage and culverts, grading, heavy roadway shaping, gravel surfacing, fencing, erosion control, seeding, fertilizing, and fiber mulching. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Rapid City |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Fertilizers, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
