Structure Replacement Bridge No. 03-0048 REBID
Closed · Pennsylvania · Last reported Dec 2024
Source: Dodge USA
Demolition of the existing structure carrying Wolf Road over Unnamed Tributary to Shaeffer Run (50 7935 5103 0048) consisting of a 41-foot long, 64 x 43 Corrugated Metal Pipe Arch Culvert with dry stacked stone headwalls. This structure will be replaced with one precast reinforced concrete box culvert with precast reinforced concrete end sections which will provide an 18 foot useable roadway width
- Status
- Closed
- Sector
- Metal, Bridge, Cement, Road, Commercial
- Location
- Toboyne Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Structure Replacement Bridge No. 03-0048 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition of the existing structure carrying Wolf Road over Unnamed Tributary to Shaeffer Run (50 7935 5103 0048) consisting of a 41-foot long, 64 x 43 Corrugated Metal Pipe Arch Culvert with dry stacked stone headwalls. This structure will be replaced with one precast reinforced concrete box culvert with precast reinforced concrete end sections which will provide an 18 foot useable roadway width; 11 foot clear span and 6 foot rise. Replacement includes Select Material Surfacing (2RC), rock ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Toboyne Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Bridge, Cement, Road, Commercial |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
