STRUMA MOTORWAY (FL20060411)
Approved · Bulgaria
Source: European Investment Bank (EIB)
The project consists of the construction of three new sections of the 2x2 Struma motorway south of Sofia from Dolna Dikanya to Blagoevgrad (Lots 1 and 2, 53.78 km) and from Damyanitsa to the Greek border at Kulata (Lot 4, 14.70 km). The total combined length is 68.48 km.The section between Blagoevgrad and Damyanitsa (67 km) is not part of this project and in the meantime, the existing I-1 road wil
- Status
- Prospective
- Sector
- Road
- Location
- Bulgaria
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about STRUMA MOTORWAY (FL20060411)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project consists of the construction of three new sections of the 2x2 Struma motorway south of Sofia from Dolna Dikanya to Blagoevgrad (Lots 1 and 2, 53.78 km) and from Damyanitsa to the Greek border at Kulata (Lot 4, 14.70 km). The total combined length is 68.48 km.The section between Blagoevgrad and Damyanitsa (67 km) is not part of this project and in the meantime, the existing I-1 road will ensure continuity. The project is located on the TEN-T network and co-financed with the EU Cohesion Fund. |
Original sector | Transport |
Budget |
Location
Country | Bulgaria |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
