St.Thomas University Vanier Hall - Electrical Systems
Bid results · New Brunswick · Last reported Jul 2020
Source: Dodge USA
scope of work and not exact details of installation. Installation shall be complete with all accessories required for complete and fully operative building electrical systems. .2 Include for removal and offsite disposal of all existing electrical systems shown to be removed or replaced in the drawings and specifications. .3 Obtain and pay for any required permits or hookup fees. .4 Include for all
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Education, Government
- Location
- Fredericton, New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about St.Thomas University Vanier Hall - Electrical Systems
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | scope of work and not exact details of installation. Installation shall be complete with all accessories required for complete and fully operative building electrical systems. .2 Include for removal and offsite disposal of all existing electrical systems shown to be removed or replaced in the drawings and specifications. .3 Obtain and pay for any required permits or hookup fees. .4 Include for all layout and levels. .5 Coordinate all building electrical installations with other trades. .6 Due... |
Procurement method |
Location
Country | Canada |
State | New Brunswick |
City | Fredericton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Education, Government |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
