logo
ProjectClosed

Student’s Hostel / Studioboxx

The status, timeline and source of this project. A free account opens every field.

Source: ArchDaily

The brief of the extension project was to create a cafeteria and additional rooms for the growing needs of the institution. Students come from the surrounding rural areas and take vocational or skill-based education at the institution. Since students starting from the age of six stay here, security and safety remain the principal concern. There were many mature trees on the land for the proposed e

Status
Closed
Sector
Education, Geothermal, Manufacturing (Industrial), Water Supply and Storage, Residential, Cement, Commercial, Warehouse
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Student’s Hostel / Studioboxx

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Student’s Hostel / Studioboxx” is an infrastructure initiative in the Education sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The brief of the extension project was to create a cafeteria and additional rooms for the growing needs of the institution. Students come from the surrounding rural areas and take vocational or skill-based education at the institution. Since students starting from the age of six stay here, security and safety remain the principal concern. There were many mature trees on the land for the proposed expansion which posed a constraint for the footprint but an opportunity for the design.A modest study center nestled in the trees has been purposefully removed from the main building to provide isolation and sanctity. A temple for meditation along with a water body is placed between the old and the new built.  Washrooms are planned to face the greenery towards an enclosed courtyard made of brick jaali. The structural system is kept simple and modular to allow seamless vertical expansion in years to come. Form finished concrete and exposed brickwork with local bricks impart an earthy and grounded look to the building. Rat trap bond brick masonry provides thermal insulation besides saving on bricks. Not to mention the saving on the plaster or paint now and in the future.Text description provided by the architects.A private educational institute in Butibori, an industrial area nearNagpurhas a school campus surrounded by hostels for girls and boys along with closed and open-air sports facilities. Amongst this was an old hostel which was originally built in the 1970s as industrial staff housing. It was later modified to house schoolboys. It was a modest two-floor structure with an L-shaped plan. Since there were three independent wings with staircases, the tenements, and the rooms weren’t linked with corridors like a normal hostel.Natural stones like Kota, Shahbaz, and Kadapa have been used for flooring and to create desks and ledges. Dormitory furniture is designed as a single sleeping, storage, and study module conserving valuable interactive space in the room.The new building was planned at a distance from the existing hostel with bridges connecting the staircases of the old hostel. This placement creates a series of courtyards punctuated by connecting bridges. The dormitory on the upper floor has a connecting corridor on the courtyard side while it also has a wide balcony on the tree-lined side for studies, other activities, and drying clothes in a dignified manner. The corridor acts as a buffer in the extreme heat during summers and provides space for carrying evaporative cooling ducts to the dormitories. An open staircase is designed in one of the courts.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Education, Geothermal, Manufacturing (Industrial), Water Supply and Storage, Residential, Cement, Commercial, Warehouse

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project