logo

Studies for the second phase of PCI 'Asturias H2 valley electrolyser'

Sector: Hydrogen • Location: Spain

Source: EU Funding & Tenders Portal

Project
Ongoing

The project contributes to the implementation of the Corridor for Hydrogen interconnections in Western Europe under the PCI Cluster 9.15 Electrolyser facilities in Spain, and more specifically to the PCI 9.15.5 Asturias H2 valley electrolyser in Asturias (ES). The overall goal is to develop 1 GW of electrolysis in the region of Asturias by 2030 with an estimated yearly production of 0.126 Mt/y of

Project Information FAQ

Project Information

3 Q
The project “Studies for the second phase of PCI 'Asturias H2 valley electrolyser'” is an infrastructure initiative in the Hydrogen sector, located in Spain. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project contributes to the implementation of the Corridor for Hydrogen interconnections in Western Europe under the PCI Cluster 9.15 Electrolyser facilities in Spain, and more specifically to the PCI 9.15.5 Asturias H2 valley electrolyser in Asturias (ES). The overall goal is to develop 1 GW of electrolysis in the region of Asturias by 2030 with an estimated yearly production of 0.126 Mt/y of hydrogen split equally between the two locations (Soto and Aboño). The PCI includes a first phase with a 150 MW electrolyser capacity in the site of Aboño, for which engineering, construction and operation is ongoing. This project is focussed on the second phase of the PCI, with an additional 350 MW electrolyser capacity in the site of Aboño and 500 MW in the site of Soto. The project scope covers all the studies necessary to implement such investments. The studies will allow to start the permitting processes with the public authorities and will also provide the detailed engineering of the project in both sites (Aboño and Soto), ensuring a precise business plan assessment and ad-hoc engineering right before construction. The scope comprises all the necessary Basic Engineering activities in the sites of Aboño and Soto, all the necessary Environmental permit documents in the two sites and the development of the Detailed engineering documents in both sites. Once the project is completed and the complete techno-economic details available, the authorisations for the execution of the investments will be granted, allowing launching the works for the construction of the electrolysis facilities for the second phase of PCI 9.15.5 in Aboño and Soto sites.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data