Studio Allston Hotel
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Selective Demo And Renovation Of Interior Partitions. Installation Of Wet Tap Wall Around Beer Cooler. New Fa Devices Will Be Provided And Synchronized. New Fp Branches And Heads To Provide Coverage For New Partitions And Ceiling Layout. Existing Fa Devices And Fp Control Valve To Remain.
- Status
- Under Construction
- Sector
- Hotel, Commercial, Manufacturing (Industrial)
- Location
- Boston, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Studio Allston Hotel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Selective Demo And Renovation Of Interior Partitions. Installation Of Wet Tap Wall Around Beer Cooler. New Fa Devices Will Be Provided And Synchronized. New Fp Branches And Heads To Provide Coverage For New Partitions And Ceiling Layout. Existing Fa Devices And Fp Control Valve To Remain. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hotel, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
