Study update of storm sewer outfalls for Quality and Erosion Control Enhancement
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
This project will complete a review of 44 storm sewer outfalls and 41 existing storm water ponds. The Town of Whitby conducted a stormwater outfall study in 2001 to identify any locations where any additional quality and erosion control enhancement could be provided to improve the quality of the water released from the outfalls to the creek. The study revealed that the majority of the outfalls wer
- Status
- Closed
- Sector
- Waste Processing and Treatment, Oil and Gas, Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Study update of storm sewer outfalls for Quality and Erosion Control Enhancement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will complete a review of 44 storm sewer outfalls and 41 existing storm water ponds. The Town of Whitby conducted a stormwater outfall study in 2001 to identify any locations where any additional quality and erosion control enhancement could be provided to improve the quality of the water released from the outfalls to the creek. The study revealed that the majority of the outfalls were constructed before the concept of stormwater quality control existed, didn’t have any quality control mechanism and recommended quality enhancement in the form of ponds at a few locations, but left many locations without any enhancement due to constructability or land issues, including non-availability of emerging technology at that time (ex. mechanical structures such as oil and grit separators and LID technology). Based on the original study six new stormwater facilities had been constructed under the pond program. Under this project, all the outfalls will be revisited, the report will be updated and new prioritized locations will be identified for quality enhancement, which will assist the Town to prepare a new pond retrofit program and implement it under capital works or though any other funding opportunities. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Oil and Gas, Water Supply and Storage |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
