logo

Study update of storm sewer outfalls for Quality and Erosion Control Enhancement

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This project will complete a review of 44 storm sewer outfalls and 41 existing storm water ponds. The Town of Whitby conducted a stormwater outfall study in 2001 to identify any locations where any additional quality and erosion control enhancement could be provided to improve the quality of the water released from the outfalls to the creek. The study revealed that the majority of the outfalls wer

Status
Closed
Sector
Water Supply and Storage, Oil and Gas, Waste Processing and Treatment, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Study update of storm sewer outfalls for Quality and Erosion Control Enhancement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Study update of storm sewer outfalls for Quality and Erosion Control Enhancement” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will complete a review of 44 storm sewer outfalls and 41 existing storm water ponds. The Town of Whitby conducted a stormwater outfall study in 2001 to identify any locations where any additional quality and erosion control enhancement could be provided to improve the quality of the water released from the outfalls to the creek. The study revealed that the majority of the outfalls were constructed before the concept of stormwater quality control existed, didn’t have any quality control mechanism and recommended quality enhancement in the form of ponds at a few locations, but left many locations without any enhancement due to constructability or land issues, including non-availability of emerging technology at that time (ex. mechanical structures such as oil and grit separators and LID technology). Based on the original study six new stormwater facilities had been constructed under the pond program. Under this project, all the outfalls will be revisited, the report will be updated and new prioritized locations will be identified for quality enhancement, which will assist the Town to prepare a new pond retrofit program and implement it under capital works or though any other funding opportunities.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Oil and Gas, Waste Processing and Treatment, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project