logo

Study update of storm sewer outfalls for Quality and Erosion Control Enhancement

Sector: Oil and Gas • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This project will complete a review of 44 storm sewer outfalls and 41 existing storm water ponds. The Town of Whitby conducted a stormwater outfall study in 2001 to identify any locations where any additional quality and erosion control enhancement could be provided to improve the quality of the water released from the outfalls to the creek. The study revealed that the majority of the outfalls wer

Project Information FAQ

Project Information

3 Q
The project “Study update of storm sewer outfalls for Quality and Erosion Control Enhancement” is an infrastructure initiative in the Oil and Gas sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will complete a review of 44 storm sewer outfalls and 41 existing storm water ponds. The Town of Whitby conducted a stormwater outfall study in 2001 to identify any locations where any additional quality and erosion control enhancement could be provided to improve the quality of the water released from the outfalls to the creek. The study revealed that the majority of the outfalls were constructed before the concept of stormwater quality control existed, didn’t have any quality control mechanism and recommended quality enhancement in the form of ponds at a few locations, but left many locations without any enhancement due to constructability or land issues, including non-availability of emerging technology at that time (ex. mechanical structures such as oil and grit separators and LID technology). Based on the original study six new stormwater facilities had been constructed under the pond program. Under this project, all the outfalls will be revisited, the report will be updated and new prioritized locations will be identified for quality enhancement, which will assist the Town to prepare a new pond retrofit program and implement it under capital works or though any other funding opportunities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data