Sturbridge Wastewater Treatment Facility Clarifier Repairs
Sector: Metal • Location: Sturbridge, Massachusetts, United States of America
Source: Dodge USA
The work consists of repairs for Primary Treatment Unit #2. Included in the structural repairs to the baffle wall as well as surface preparation and coating of the steel clarifier, clarifier mechanical elements, ductile iron piping, and baffle wall. Bids shall be on a lump sum basis.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work consists of repairs for Primary Treatment Unit #2. Included in the structural repairs to the baffle wall as well as surface preparation and coating of the steel clarifier, clarifier mechanical elements, ductile iron piping, and baffle wall. Bids shall be on a lump sum basis. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
