SU Toll Road Private Limited
Sector: Automotive • Location: Benue, India
Source: World Bank Group
In July 2007, the National Highway Authority of India (NHAI) signed a 25 year concession contract (including 25 month of construction period) to India’s Reliance Energy Ltd. (Reliance) to widen and strengthen the 135.3 km section on National Highway (NH) 68 between Salem to Ulundurpet in the state of Tamil Nadu.
Under the contract, Reliance was responsible for the design, construction, finance,
- Status
- Prospective
- Sector
- Automotive, Residential, Road, Government, Commercial
- Location
- Benue, India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SU Toll Road Private Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In July 2007, the National Highway Authority of India (NHAI) signed a 25 year concession contract (including 25 month of construction period) to India’s Reliance Energy Ltd. (Reliance) to widen and strengthen the 135.3 km section on National Highway (NH) 68 between Salem to Ulundurpet in the state of Tamil Nadu. Under the contract, Reliance was responsible for the design, construction, finance, operation and maintenance and widening of the existing two-lane highway to a four-lane highway with paved shoulders. The expansion project, part of National Highway Development Project - Phase IIIA, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. Reliance established SU Toll Road Pvt. Ltd., a special purpose vehicle, to implement the project. Reliance won the tender through competitive bidding, conducted by NHAI by requesting the lowest fixed subsidy of US$ 91.51 million. Apart from this upfront payment by NHAI, under the contract, SU Toll Road Pvt. Ltd. was to recover the capital costs and operating costs including returns through toll collections during the concession period. The concession agreement for the project was signed in July 2007. The total capital cost of the project was estimated at US$ 235.25 million. Construction on the project began in July 2007 and is expected to be completed by June 2010. www.pppinindia.com www.projectstoday.com www.nhai.org www.infrastructure.gov.in |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
State | Benue |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Residential, Road, Government, Commercial |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in India
- Mundra Ultra Mega Power Plant Gujarat
- Dholera Solar Park Gujarat
- ONGC Tripura Power Plant
- Tuppadahalli Wind Farm
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Abhijeet MADC Nagpur Energy Private Limited (AMNEPL
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
